Completed Projects
Charcoal Composite Deck, Ullswater: A Case Study
A rotting timber deck replaced with a charcoal capped composite platform on an aluminium substructure, with recessed lighting to every step. Filmed throughout, and documented here stage by stage.

The brief
A rotting timber deck replaced with a charcoal capped composite platform on an aluminium substructure, with recessed lighting to every step.
What we specified
The details that shaped the finished scheme:
- Charcoal capped composite, 25 year warranty
- Aluminium substructure at 400mm centres
- Recessed step and perimeter lighting
- Hidden fixings throughout — no visible screws

The installation
Day 1 — Clearance and setting out.
Day 2 — Foundations and posts.
Day 3 — Substructure and joists.
Day 4 — Board laying.
Day 5 — Fascia, lighting and handover.

The result
A composite deck that suits the property rather than the brochure, delivered on programme and handed over with a maintenance pack.



Common questions
Ready to talk it through in person?
We will walk your garden, take levels and talk honestly about what will work — no pressure, no sales pitch.
Prefer to browse first?Request our complimentary brochure

